Annual Asbestos Notification

The presence of asbestos in a building, undisturbed, does not present a health hazard. Do not disturb any asbestos-containing construction material (ACCM) in your workplace. Only persons authorized and properly trained are allowed to perform work that disturbs ACCM.

As required by state law, all employees and contractors who work in campus buildings are notified annually as to where asbestos is present. For complete details, see the 2023 Annual Asbestos Building ReportPDF File online on the EHS website.

 

Environmental Health & Safety | ehs.fullerton.edu | T-1475 (Lot A South) | (657) 278-7233 (SAFE) | safety@fullerton.edu

Permanent Road Closure Near ECS & Student Housing

WHEN:
Permanently effective as of Tuesday, January 17th, 2023

WHERE:
The road on the east side of the Engineering Computer Science (ECS) Complex.

WHAT:
Effective January 17th, the road between ECS and the new student housing complex will be permanently closed to vehicular traffic.

Cars exiting to the north from parking lots I & F will be able to gain access to East Campus Drive by using the roadway directly north of the Eastside Parking Structure North.

WHAT IS REQUIRED OF ME:
For pedestrian safety, this road will be permanently closed to vehicular traffic. Please watch for barricades and follow detour signs.

Plan ahead and allow extra time for travel into and around the campus. Student parking and the route along East Campus Drive will remain accessible.

CONTACT:
John Spencer | (657) 278-7665 | jospencer@fullerton.edu

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu  | www.facilities.fullerton.edu

Associated Road: City of Fullerton Street Improvement Project (7/24-11/20)

PROJECT DATES:
July 24th through November 20th, 2023

WHERE:
Associated Road, from Bastanchury Road to Imperial Highway

WHAT:
The City of Fullerton will continue the street improvement project on Associated Road, spanning from Bastanchury Road to Imperial Highway. While this project is not directly next to the campus, it will impact staff, faculty, and students who use this corridor to commute to and from campus.

WHAT IS REQUIRED OF ME:
For your safety, watch for barricades, stay out of the project zones, and follow any detour signs. Please plan ahead and allow extra time for travel into and around the campus. 

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu  | https://facilities.fullerton.edu

Welcome Back! Fall 2023 Service Reminders

Welcome back to Cal State Fullerton for the Fall 2023 semester! As we enter a new academic year, we want to share some key service reminders with you:

Service Center
Hours: Monday through Friday, 7:00am to 5:00pm
Phone: (657) 278-3494 or ext. 3494 on Zoom Phone
Email: ServiceCenter@fullerton.edu
The service center is your hub for campus maintenance requests, including plumbing, HVAC, spill cleanups, e-waste pickups, and more. Start by reaching out to your department coordinator to identify if you have a designated facilities coordinator for your area.

Classroom Access
Custodial services unlock classrooms daily. However, if you find your classroom is locked, please get in touch with the Service Center for prompt assistance in unlocking general-use classrooms.

Optimal Classroom Occupancy
During the first two weeks of the semester, we align classroom seating with the fire marshal’s maximum occupancy guidelines. If your class enrollment exceeds the occupancy limit, please refrain from relocating chairs or desks from other classrooms, and instead call the Scheduling Office to make further arrangements for your class. For accessibility inquiries, contact Disability Support Services at (657) 278-3112.

Redecorating and Furniture Moves
For the safety, accessibility, and well-being of our campus community, only CPFM employees are authorized to hang items, drill into walls, or move furniture and equipment. For larger renovations, begin planning and budgeting for Summer 2024 by contacting our Service Center to start the process.

Planning of Special Events
Hosting an event this semester? We are here to help! Please connect with our Service Center in the early stages of planning, at least three weeks prior to the event date, for assistance with auxiliary power, waste management, custodial services, landscaping, and more.

Stay Informed
Exciting projects are always underway at CSUF! Check your email inbox for campus facilities updates, and visit https://facilities.fullerton.edu for project updates and useful resources.

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu | https://facilities.fullerton.edu

Langsdorf Hall: HVAC Shutoff on 8th and 9th Floors (9/15-9/29 PM Only)

WHEN:
Dates: Friday, September 15th through Friday, September 29th, 2023

Times: 6:00pm to 6:00am

WHERE:
Langsdorf Hall 8th and 9th Floors

WHAT:
In an effort to minimize the spread of dust and debris generated during the 9th-floor suite demolition project, we will be temporarily shutting off the HVAC air supply each evening.

This will have an indirect effect on airflow in the 8th-floor area. For any occupants on the 8th who plan on leaving after 6:00pm, please contact the Project Manager or the On-Call Manager (numbers listed below). No other floors will be impacted.

WHAT IS REQUIRED OF ME:
For your safety, watch for barricades, stay out of the project zones, and follow any detour signs.

We appreciate your cooperation and support as we work to ensure the continued functionality and improvements of our facilities. We understand this may cause temporary inconvenience, and we appreciate your patience and understanding during this project.

CONTACT:
Felipe Meza | (714) 618-6823 | fmeza@fullerton.edu

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu | https://facilities.fullerton.edu

Emergency Lighting Walks: CBE Building (9/15)

WHEN:
Friday, September 15th, starting at 7:00pm

WHERE: 
College of Business & Economics (CBE) building

WHAT:
In line with federal and state safety codes, Cal State Fullerton is required to perform annual 90-minute emergency lighting walks for each building on campus.

During this time, power to the building will be shut off, emergency backup power enabled, and our staff inspectors walk the entire building to verify that all necessary emergency lighting is operational.

WHAT IS REQUIRED OF ME:
At the end of the workday on Friday, September 1st, please shut down and disconnect any computers, laptops, printers, and other sensitive electronic equipment by unplugging them from the wall outlets.

Avoid using the building elevators near the time of the shutdown.

We understand that this may cause temporary inconveniences, and we appreciate your patience and understanding during these tests.

CONTACT:
Michael Grace | (657) 278-7342 | migrace@fullerton.edu

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu | facilities.fullerton.edu

PLS Water Shut-Off (9/16-9/17)

WHEN:
Saturday, September 16th at 4:00am through Sunday, September 17th at 2:30pm

WHERE:
Pollak Library South (PLS)

WHAT:
Crews are scheduled to perform plumbing-related maintenance repairs next Saturday and Sunday in PLS. During this time, water will be shut off to the building, including restrooms, drinking fountains, and sinks.

The nearest available restrooms and drinking fountains are located in Pollak Library North (PLN).

You may notice cloudiness, bubbles, or a color change once the water supply is restored; these changes are normal and will subside as water runs through the pipes.

WHAT IS REQUIRED OF ME:
For your safety, watch for barricades, stay out of the project zones, and follow any detour signs.

Thank you for your cooperation and support as we work to ensure the continued functionality of our facilities. We understand that this may cause temporary inconveniences, and we appreciate your patience and understanding during this necessary work.

CONTACT:
Enrique Chavez | (657) 278-2415 | echavez@fullerton.edu  

 

Request Service: (657) 278-3494 | servicecenter@fullerton.edu | facilities.fullerton.edu

 


 

 


 

CPFM MEDIA REQUESTS
 

 

All media requests must be made in writing.

Please allow at least three business days for initial response.

Follow up to media requests without specific questions listed on the form is not guaranteed.

 

Link to Media Request Form

 

CPFM Official Statement on Harvesting Orange Trees at CSUF

 

Issued: March 1, 2023

There are three locations on campus where orange trees grow, in front of Langsdorf Hall, behind SGMH, and along the Promenade. Fruit provided by the orange trees on campus is available for students to pick for personal use, provided care is taken to avoid personal injury or cause damage to the trees (no climbing of trees, no removal or breaking of branches, and picking only ripe fruit). It is important to note that the Arboretum is a separate entity with its own policies for its trees and plants.

A collaborative effort is currently in the works between CPFM and the Environmental Justice Club to harvest fruit for the benefit of the campus Pantry. It is our hope that moving forward, CSUF student organizations will work together to coordinate future harvesting and distribution of the fruit to the campus Pantry. This will not only help provide produce to help fight food insecurity among the student population but aids in reducing fruit from going to waste on the ground.