Gordon Hall Elevator Replacement - Oct. 16

The replacement of older elevators is a top campus priority. We are continuing our work this fall to upgrade the elevators in Gordon Hall and McCarthy Hall to improve reliability and accessibility. We’re also assessing current elevator conditions across campus to plan for possible additional upgrades.

When: The second of two elevators will be replaced in Gordon Hall beginning next Wednesday, Oct. 16.

Elevator replacement in McCarthy Hall is underway, and is awaiting State Fire Marshal approval.

We aim to have new, more efficient elevators in operation by the end of this year. However, please be aware that elevator upgrades are complex, and that unforeseen delays, such as with parts delivery or third-party inspections, may extend the repairs.

Where: Gordon Hall and McCarthy Hall

One elevator will remain available in each building throughout the project. Access priority must be given to people with disabilities, pregnant women and parents/guardians using strollers.

Please leave plenty of time to arrive at your destination, in case there is a brief wait for the available elevator.

Consider using the stairs to help minimize elevator traffic jams (and to get your daily steps in!)

As always, stairwells and escalators will be kept clean, safe and open for your use.

If you need to transport bulky items up or downstairs, we recommend scheduling the move for off-peak hours – in the early morning or evening.

A large construction crane will be used at certain points during the project to remove old equipment and position the new elevators. Please watch for roped-off areas to avoid the crane.

Thank you for your patience and support for these important upgrades.

If you have further questions, please contact Pam Newton at (657) 278-3199 - office, (657) 253-2896 - cell, or via email at pnewton@fullerton.edu.

Langsdorf Hall 6th and 7th Floors - Oct. 11 - Nov. 3

The HVAC system on Langsdorf Hall's 6th and 7th floors will be shut down over the next four weekends to allow for flooring replacement and asbestos abatement as part of a full renovation of the 6th floor.

When: 5 p.m. Friday, Oct. 11 to 4 p.m. Sunday, Oct. 13

5 p.m. Friday, Oct. 18 to 4 p.m. Sunday, Oct. 20

5 p.m. Friday, Oct. 25 to 4 p.m. Sunday, Oct. 27

5 p.m. Friday, Nov. 1 to 4 p.m. Sunday, Nov. 3

Where: Langsdorf Hall – 6th and 7th floors

Only trained personnel will be allowed on the 6th floor; please stay clear. Each Monday morning, the HVAC system will be restored and the 7th floor will be cleared for occupancy by a third-party specialist. We appreciate your patience and understanding.

If you have further questions on the abatement, please contact Pearl Boelter, Environmental Health & Safety Director, at (657) 278-4345, (714) 732-4222 or via email at pboelter@fullerton.edu.

Ruby Gerontology Center Scheduled Power Shutdown - Oct. 12

Power to the Ruby Gerontology Center is scheduled to be temporarily shut down at night this Saturday, Oct. 12. In line with federal and state safety codes, Cal State Fullerton is required to perform annual 90-minute after-dark emergency lighting walks for each building on campus. During this time, power to the building is shut off, the emergency generator is run, and our staff inspectors walk the entire building to verify that all necessary emergency lighting is operational.

When: Saturday night, Oct. 12, from approximately 10 p.m. to 1 a.m.

Where: Ruby Gerontology Center

At the end of the work day this Friday, Oct. 11, please shut down and disconnect any computers, laptops, printers and any other sensitive electronic equipment by unplugging them from the wall outlets, if possible. Avoid using the building elevators near the time of the shutdown. We appreciate your patience and understanding.

If you have further questions, please contact Michael Grace, Facilities Analyst, at (657) 278-7342 or via email at migrace@fullerton.edu.

Education Classroom Scheduled Power Shutdown - Oct. 12

Power to the Education Classroom building is scheduled to be temporarily shut down at night this Saturday, Oct. 12. In line with federal and state safety codes, Cal State Fullerton is required to perform annual 90-minute after-dark emergency lighting walks for each building on campus. During this time, power to the building is shut off, the emergency generator is run, and our staff inspectors walk the entire building to verify that all necessary emergency lighting is operational.

When: Saturday night, Oct. 12, from approximately 10 p.m. to 1 a.m. We are coordinating with the crew currently replacing the building roof.

Where: Education Classroom building

At the end of the work day this Friday, Oct. 11, please shut down and disconnect any computers, laptops, printers and any other sensitive electronic equipment by unplugging them from the wall outlets, if possible. Avoid using the building elevators near the time of the shutdown. We appreciate your patience and understanding.

If you have further questions, please contact Michael Grace, Facilities Analyst, at (657) 278-7342 or via email at migrace@fullerton.edu.

Pollak Library South Power Shutdown - Oct. 7

As part of ongoing construction work, power will be shut down on the 6th floor of Pollak Library South Monday night. The shutdown will affect the 6th floor electrical and fire alarm systems, as well as HVAC for the entire building.

When: Approximately 10 p.m. to 6 a.m. Monday, Oct. 7

Where: Pollak Library South

Occupants should not notice any impact. The building will be on fire watch during the demolition work. The University Police Department has been notified. We appreciate your patience and understanding.

If you have further questions, please contact Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

Education Classroom Roof Demolition - Oct. 5-6 and Oct. 12-13

Immediately following an event scheduled this Saturday, the Education Classroom bridge and building will be closed over the next two weekends to allow for the safe demolition of the building’s roof. Replacement of the roof is fast-tracked to be completed this fall, to prevent leaks and damage during the rainy season.

When: Work will begin this Saturday, Oct. 5, immediately following the “Fall Into Reading Fun” event set from 10-11:30 a.m. in EC-24. (Some minor prep work will be completed prior to the event.)

Construction fencing will be installed and a large crane will be positioned on-site. Once our crew sweeps the building to ensure all occupants have left, entry doors will be locked and roof demolition will take place:

Saturday, Oct. 5, from noon to 5 p.m.; Sunday, Oct. 6, from 6:30 a.m. to 5 p.m.; Saturday, Oct. 12, from 6:30 a.m. to 5 p.m. and Sunday, Oct. 13, from 6:30 a.m. to 5 p.m.

These dates have been cleared by the departments housed in the building. Roof installation will follow, through early November. Please note that the tentative schedule may be adjusted due to weather conditions, availability of materials, or other unforeseen circumstances.

Where: Education Classroom building

For your safety, the construction area and crane will be fenced off, and all building entry doors will be locked during the demolition. To avoid the potential for falling debris, watch for barricades, stay out of the construction zone, and follow detour signs.

Through the course of the project, we will work closely with the contractor and coordinate with building occupants to minimize impact on your work and studies. We appreciate your patience and understanding.

If you have questions, please contact Tuan Nguyen, Physical Plant Director, at (657) 278-5322, (714) 287-0210 or via email at tuanguyen@fullerton.edu.

KHS Building Water Shutdown - Oct. 5

Water in the southwest portion of the Kinesiology and Health Science building is scheduled to be shut down this Saturday to allow our plumbing crew to make repairs to the domestic cold water line.

When: Saturday, Oct. 5 from approximately 5 a.m. to 3:30 p.m.

Where: Kinesiology and Health Science building – southwest side of the basement, 1st floor and 2nd floor; KHS 199 men’s and women’s restrooms

Restrooms, drinking fountains and sinks will not be available in the affected areas listed above; all other areas will have water. If you are on campus this weekend, please use facilities in other parts of the building.

You may notice cloudiness, bubbles or a color change once the water supply is restored; these changes are normal and will subside as water is run through the pipes. We apologize for the late notice and appreciate your patience and understanding.

If you have questions, please contact Tuan Nguyen, Physical Plant Director, at (657) 278-5322, (714) 287-0210 or via email at tuanguyen@fullerton.edu.

Kinesiology and Health Science Power Shutdown - Sept. 28

Power to the Kinesiology and Health Science building is scheduled to be temporarily shut down at night this Saturday, Sept. 28.

In line with federal and state safety codes, Cal State Fullerton is required to perform annual 90-minute after-dark emergency lighting walks for each building on campus. During this time, power to the building is shut off, the emergency generator is run, and our staff inspectors walk the entire building to verify that all necessary emergency lighting is operational.

This will be the first of several KHS shutdowns as we upgrade lighting surrounding Titan Gym.

When: Saturday night, Sept. 28, from approximately 10 p.m. to 1 a.m. (following a scheduled volleyball game)

Where: Kinesiology and Health Science – entire building

At the end of the work day this Friday, Sept. 27, please shut down and disconnect any computers, laptops, printers and any other sensitive electronic equipment by unplugging them from the wall outlets, if possible. Avoid using the building elevators near the time of the shutdown. We appreciate your patience and understanding.

If you have questions or concerns, please contact Michael Grace, Facilities Analyst, at (657) 278-7342 or via email at migrace@fullerton.edu.

Dan Black Hall Elevator Repair - Sept. 25

The elevator on the far west end of Dan Black Hall remains out of service due to a faulty hydraulic piston.

When: Parts are on order and the elevator will be repaired as quickly as possible.

Where: Dan Black Hall – west end

The other building elevator is still in service. We apologize for the inconvenience and appreciate your patience and understanding as we fast-track this repair.

If you have questions or concerns, please contact our Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

Education Classroom Building Closure - Sept. 21-22

The Education Classroom building will be closed this weekend to allow for the safe demolition of the building’s roof. Replacement of the roof is fast-tracked to be completed this fall, to prevent leaks and damage during the rainy season.

When: Saturday and Sunday, Sept. 21-22, from 6:30 a.m. to 5 p.m.

These dates have been cleared by the departments housed in the building.

Additional demolition and roof installation will follow, through October. Please note that the tentative schedule may be adjusted due to weather conditions, availability of materials, or other unforeseen circumstances.

Where: Education Classroom building

For your safety, the construction area will be fenced off and all building entry doors will be locked during the demolition. To avoid the potential for falling debris, watch for barricades, stay out of the construction zone, and follow detour signs.

Through the course of the project, we will work closely with the contractor to minimize any impact on your work and studies. We appreciate your patience and understanding.

If you have questions or concerns, please contact Tuan Nguyen, Physical Plant Director, at (657) 278-5322, (714) 287-0210 or via email at tuanguyen@fullerton.edu.

Computer Science Elevator Repair - Sept. 20

Our elevator repair service, Thyssenkrupp, has identified a problem with the gear box in Computer Science Elevator #1. The elevator has been shut down while parts are on order.

When: Effective this morning, Friday, Sept. 20. The elevator will be repaired as quickly as possible once the parts are secured.

Where: Computer Science Elevator #1

Elevator #2 remains available. We apologize for the inconvenience and appreciate your patience and understanding as we fast-track this repair.

If you have questions or concerns, please contact our Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

Pollak Library Window Work - Sept. 23

Prep work for the installation of Pollak Library South windows is set to resume next week. The work is part of an ongoing project to install a total of 70 ventilation windows for smoke control on the 2nd through 6th floors of the building. This and other required fire-life-safety upgrades, including basement smoke control and a new modern fire lane, will allow for the reopening of the 4th-6th floors..

Where: Pollak Library South exterior – south and west walls

When: Prep work will be done at night, Sunday through Thursday, from approximately 10 p.m. to 6:30 a.m., for approximately three weeks.

All work will be done outside. If you plan to be on-campus after hours, please watch for protective barriers and signage, and avoid the construction zone. Barriers will be removed during the day.Our crew will do its best to minimize any impact on building occupants. We appreciate your patience and understanding.

If you have further questions, please contact Service Manager Pam Newton at (657) 278-3199 or via email at pnewton@fullerton.edu.

Pollak Library Fire System Repairs - Sept. 20

The fire alarms and fire sprinkler system on the third and fourth floors of Pollak Library South will be temporarily shut down early Friday to allow for repairs.

When: Approximately 6 a.m. to 10 a.m. Friday, Sept. 20

Where: Pollak Library South – third and fourth floors

Occupants should not notice any impact. The building will be on fire watch during the repairs. The University Police Department has been notified. We appreciate your patience and understanding.

If you have further questions, please contact Service Manager Pam Newton at (657) 278-3199 or via email at pnewton@fullerton.edu.

KHS Building Water Shutdown - Sept. 14

Water in portions of the Kinesiology and Health Science building is scheduled to be shut down this Saturday to allow our plumbing crew to make repairs to the domestic cold water line.

When: Saturday, Sept. 14 from approximately 5 a.m. to 3:30 p.m.

Where: Kinesiology and Health Science building – southwest side of the basement, 1st floor and 2nd floor, KHS 199 men’s and women’s restrooms

Restrooms, drinking fountains and sinks will not be available in the affected areas listed above; all other areas will have water. If you are on campus this weekend, please use facilities in other parts of the building.

You may notice cloudiness, bubbles or a color change once the water supply is restored; these changes are normal and will subside as water is run through the pipes. We apologize for the late notice and appreciate your patience and understanding.

If you have further questions, please contact Hugo Contreras, Supervising Plumber, at (657) 278-2014, (714) 732-4947 or via email at hucontreras@fullerton.edu.

West Campus Drive Electrical Work - Sept. 11

A section of West Campus Drive near the tennis courts will be closed at night on various days over the next two weeks. Underground utility lines will be installed as part of a project to upgrade campus power capacity.

When: 10 p.m. to 6 a.m. Sunday, Sept. 15 through approximately Monday, Sept. 30

Where: West Campus Drive between the tennis courts and the Children’s Center. Both lanes will be closed to vehicles, but the sidewalk will remain open for pedestrians and bicyclists. See the attached map for the construction zone, in red.

During the time of the closure, please use an alternate route to avoid the area. The Associated Road entrance off Yorba Linda Boulevard can be used to reach the northwest corner of campus. We apologize for the inconvenience and appreciate your patience and understanding.

If you have questions, please contact Project Manager John Spencer at (657) 278-7665 or jospencer@fullerton.edu.

Escalator Testing - Sept. 18-Oct. 1

Escalators in McCarthy Hall and Titan Shops will be temporarily out-of-service on five upcoming dates as state officials conduct annual safety inspections..

When: All inspections will begin at 8 a.m. Escalators will be returned to service at the end of each day or when the inspection is complete, whichever is sooner. Inspection dates are: Wednesday, Sept. 18; Thursday, Sept. 19; Friday, Sept. 20; Tuesday, Sept. 24; Tuesday, Oct. 1

Where: McCarthy Hall – floors 1-4 and Titan Shops – floors 1-2

Please be aware that one elevator is currently available in McCarthy Hall due to a replacement project. While the escalators are down, if possible, please use the stairs instead. We appreciate your patience and understanding.

If you have questions, please contact Service Manager Pam Newton at (657) 278-3199 or via email at pnewton@fullerton.edu.

External Speaker Testing - Sept. 9

As part of ongoing efforts to ensure campus safety, early Monday our specialty contractor will be testing two external speakers near your building that are part of our campus emergency notification system.

When: Monday, Sept. 9 beginning at approximately 4 a.m.

Where: Between the Humanities and Education Classroom buildings

The testing has been scheduled early in the morning to minimize campus disruptions. Anyone in the area will hear a human voice announcing a test message for approximately 30 seconds. We appreciate your patience and understanding.

If you have further questions, please contact Tuan Nguyen, Physical Plant Director, at (657) 278-5322 or via email at tuannguyen@fullerton.edu.

Education Classroom 1st Floor Women's Restroom - August 28

The first-floor women’s restroom in the Education Classroom building is closed for cleanup and repairs to the ceiling and plaster walls following a plumbing leak. Our crew is working to expedite these repairs and reopen the restroom as soon as possible.

When: Due to the required process for plaster repairs, this project is expected to take 4-5 weeks.

Where: Education Classroom building – 1st floor women’s restroom

Please use available restrooms in the northeast corner of the building, and on other floors. We apologize for the inconvenience and appreciate your patience and understanding.

If you have questions, please contact our Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

Computer Science Elevator #1 - August 28

Troubleshooters from our elevator repair service, Thyssenkrupp, are currently running diagnostics and making repairs to elevator #1 in the Computer Science building. Elevator #2 remains available.

We apologize for the inconvenience and appreciate your patience and understanding as we fast-track these repairs.

If you have questions or concerns, please contact our Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

EC Roof Replacement - August 23

After much preparation, the State Fire Marshal has approved plans for the full replacement of the Education Classroom building roof to prevent leaks and damage during rainy weather. The project is fast-tracked to begin tonight with asbestos abatement, which will require temporarily shutting off the building’s HVAC system. We apologize for the late notice.

When: The asbestos abatement and HVAC shutdown is scheduled for Friday, August 23, from 5 p.m. to 1:30 a.m. and Saturday, August 24, from 7 a.m. to 3:30 p.m. The remainder of the project will follow in September and October. Please watch for an updated schedule.

Where: Education Classroom building

If you plan to be on-campus this weekend, please be aware that the building’s HVAC system will be shut down during the hours listed above. Through the course of the project, we will work closely with the contractor to minimize any impact on your work and studies. We appreciate your patience and understanding.

If you have questions, please contact Pearl Boelter, Environmental Health & Safety Director, at (657) 278-4345, (714) 732-4222 or via email at pboelter@fullerton.edu.

Pollak Library Temporary Power Shutdown - August 22

An electrical panel in Pollak Library’s basement will be temporarily shut down early tomorrow to allow our construction crew to complete electrical work. The shutdown will briefly affect the fire sprinkler pump and phone system for the building.

When: 4 a.m. Thursday, Aug. 22, for approximately half an hour

Where: Pollak Library – entire building

The work has been planned while the building is expected to be vacant, so occupants should not notice any impact. The phone system will remain connected to temporary power as a precautionary measure. We appreciate your patience and understanding.

If you have further questions, please contact Service Manager Pam Newton at (657) 278-3199 or pnewton@fullerton.edu.

Mihaylo Starbucks Fire Alarm Testing - August 21

As the final step in a summer renovation project, the State Fire Marshal will be testing the fire-life-safety equipment inside the Mihaylo Hall Starbucks tomorrow morning before the eatery is slated for reopening for the fall semester.

When: Approximately 8 a.m. to noon, Wednesday, August 21

Where: Mihaylo Hall 1st Floor Lobby Starbucks

You may briefly hear fire alarms related to the testing. We apologize for the late notice and appreciate your patience and understanding.

Contact: If you have further questions, please contact Campus Inspector Ted Nakasuji at (657) 278-4734 or tnakasuji@fullerton.edu.